News from the Service Team

azcue-pump-crabber-build
Protected: Azcue Pumps Supplied to Prestigious Boatyard
July 4, 2019
engineering-news-august-2019
Latest Engineering Team News
August 13, 2019
azcue-pump-crabber-build
Protected: Azcue Pumps Supplied to Prestigious Boatyard
July 4, 2019
engineering-news-august-2019
Latest Engineering Team News
August 13, 2019

As usual the Service Team are incredibly busy with several engine projects including the following:

We have just carried out an annual load bank test of a 400 Kva Doosan powered generating set for a customer in Plymouth. The set is a prime power unit which rarely runs at full load so periodic full load runs are carried out as part of routine maintenance.


We received a call from a local customer with an engine overspeed fault, an engineer was despatched immediately. The fault was diagnosed and rectified as well as the parts available in stock on the service van meaning the vessel was back to sea within two hours.